|
The scope of work on this 775,000 square foot building program included these mechanical systems:
*7,200 ton Chilled Water/Condenser Water System
*Primary/Secondary Variable Flow Pumping System for Chilled Water
*Building Automation System utilizing Direct Digital Controls
*Energy Recovery Wheel Heat Exchangers at the Air Handlers
*Enhanced Indoor Air Quality (IAQ)
|