GREEN VALLEY RANCH
Henderson, Nevada


Gallery

Construction Cost: $295 million (Yr 2000 Dollar) $125 million - Phase III

Mechanical Construction Cost: $35 million, 10 million

The Green Valley Ranch single handedly raised the bar in the "local" casino market. State of the art Indoor Air Quality (IAQ) techniques including Computational Fluid Dynamic (CFD) modeling to achieve ultimate IAQ and also aesthetic placement of the air distribution devises sets this resort apart from the rest.


Project Attributes

The scope of work on this 790,000 square foot building program included these mechanical systems:

*300,000 CFM Variable and Constant Air Volume System

*50,000 CFM General Exhaust System

*80,000 CFM Grease Exhaust System

*2,600 Ton Chilled Water / Condenser Water System

*250 GPM Domestic Water Booster Pump Stations

*8,000,000 BTUH Domestic Hot Water Generation System

*Primary / Secondary Variable Flow Pumping System for Chilled Water

*Condenser Water Pumping System

*Building Automation System utilizing Direct Digital Controls




 
| | |